News
GAIA Institut Soil installed
Date: 03/12/2009
The GAIA Institute has deivered and installed 105 "Super Sacs" of GAIA soil on the Linda Tool facility. This installation took place over a 2 week period and is the first step of the "Green Roof" part of the process.







